Perdido Project Start Up Day 4 & 5

[caption id="attachment_103" align="alignright" width="300" caption="Fuel Gas Booster from the Drive Motor Side"][/caption] We are WOG (waiting on gas).  The plant is complete, the flare package is complete and we are waiting on the programming to be complete on the flare package to start moving gas...
Read more

Perdido LFG Plant Start Up – Day 3

[caption id="attachment_95" align="alignright" width="300" caption="2- 3520C CAT Generators - 3.2 MW in Phase 1"][/caption] Plant start up shifts into getting the generators and switchgear ready.  Patten Power from Chicago is helping the LFG Tech team preping the engines.  ENERCON will be here on Monday...
Read more

Perdido Power Plant Enters Start Up Phase

I am headed to Pensacola on Monday to begin the start up phase of the Perdido Power Plant.  Perdido is located at the Escambia County Landfill, owned by Gulf Power Company and designed, built and operated by LFG Technologies.  The plant includes two CAT 3520C generators and will be expanded to four generators as landfill...
Read more