Perdido Project Start Up Day 4 & 5

Written by Barry on September 18, 2010

We are WOG (waiting on gas).  The plant is complete, the flare package is complete and we are waiting on the programming to be complete on the flare package to start moving gas to the plant.  Plent activities yesterday and today are cleaning and finishing loose ends. Once we have gas to the plant we [...]

Read more »

Leave a comment...

Perdido LFG Plant Start Up – Day 3

Written by Barry on September 15, 2010

Plant start up shifts into getting the generators and switchgear ready.  Patten Power from Chicago is helping the LFG Tech team preping the engines.  ENERCON will be here on Monday to finish the prep for the switchgear and Chuck Anderson with LFG Tech will be in later next week to finish the “phasing” and relay [...]

Read more »

1 Comment

Perdido LFG Project – Second Day Startup

Written by Barry on September 15, 2010

Tuesday was the first full day on the project start up.  The flare and blower package provided by LFG Tech will provide the vacuum to the landfill and ship the LFG to the power plant.  Tuesday morning was spent aligning the direct drive blower and starting the programming of the control panel.  John Lenting with [...]

Read more »

Leave a comment...

LFG Tech Partner Awarded Contract to Build 13.3 mile LFG Pipeline

Written by Barry on September 12, 2010

Veolia signed a contract to sell gas from its Emerald Park Landfill in Muskego, WI to the Milwaukee Metropolitan Sewerage District (MMSD) that will use it in lieu of more expensive natural gas at its sewage treatment plant in Jones Island. Under the 20-year agreement, the MMSD will pay $2.11 per dekatherm (MMBtu) or 48% [...]

Read more »

Leave a comment...

Perdido Power Plant Enters Start Up Phase

Written by Barry on September 11, 2010

I am headed to Pensacola on Monday to begin the start up phase of the Perdido Power Plant.  Perdido is located at the Escambia County Landfill, owned by Gulf Power Company and designed, built and operated by LFG Technologies.  The plant includes two CAT 3520C generators and will be expanded to four generators as landfill [...]

Read more »

Leave a comment...

  • Popular Posts

    1. 53% Perdido Project Start Up Day 4 & 5
    2. 11% Billings Project Pess Release
    3. 9% CAT 3520C Landfill Gas Generators for Sale
    4. 7% CAT 3516 SITA LE 800 kW Landfill Gas Generators for Sale
    5. 5% Perdido LFG Plant Start Up - Day 3
    6. 3% In the News!
    7. 2% Perdido Power Plant Enters Start Up Phase
    8. 2% LFG Technologies to break ground on expansion project!
    9. 2% Perdido LFG Project - Second Day Startup
    10. 2% LFG Technologies Launches New Blog!
  • Recent Posts

    • Billings Project Pess Release
    • CAT 3516 SITA LE 800 kW Landfill Gas Generators for Sale
    • CAT 3520C Landfill Gas Generators for Sale
    • SWANA LFG Conference Over for 2011
    • LFG Technologies to break ground on expansion project!
  • Recent Comments

    • Brett on Perdido LFG Plant Start Up – Day 3
  • Categories

    • Projects (3)
    • Start UP (3)
    • Uncategorized (9)
    • Utility Flare (1)
  • Archives

    • May 2011 (1)
    • March 2011 (3)
    • February 2011 (3)
    • January 2011 (1)
    • December 2010 (1)
    • November 2010 (1)
    • September 2010 (5)
    • August 2010 (1)

Home  |  Blog  |  Biogas News  |  Projects  |  Products  |  Engineering  |  Links  |  LFG University  |  Video  |  Team  |  Contact Us  |  Login

Copyright © 2012 LFG Technologies, Inc.