Tuesday was the first full day on the project start up.  The flare and blower package provided by LFG Tech will provide the vacuum to the landfill and ship the LFG to the power plant.  Tuesday morning was spent aligning the direct drive blower and starting the programming of the control panel.  John Lenting with Patton Power is back at the project inspecting and getting the two 3520 C generators ready for start up.  Much work to be done and we will try to keep you up to date on our progress.

From the project.

Barry